Yes, absolutely. There is no need to replace the entire plant. The system is typically integrated into the first effect (pre-concentration) of the evaporation process, drastically alleviating the main steam load of the station. In technical literature, this is referred to as a “Booster MVR” application, and it is the method that yields the fastest ROI.